{"id":8415,"date":"2025-03-10T00:00:58","date_gmt":"2025-03-09T17:00:58","guid":{"rendered":"http:\/\/huttons.com.vn\/?p=8415"},"modified":"2025-03-28T08:59:51","modified_gmt":"2025-03-28T01:59:51","slug":"cap-nhat-thong-tin-cau-binh-khanh","status":"publish","type":"post","link":"https:\/\/huttons.com.vn\/en\/tien-do-cau-binh-khanh-noi-nha-be-va-can-gio-8415","title":{"rendered":"Construction update Binh Khanh Bridge connecting Nha Be and Can Gio District"},"content":{"rendered":"<p style=\"text-align: justify;\"><b>Binh Khanh Bridge<\/b> is located on the Ben Luc - Long Thanh Expressway, a cable-stayed road bridge crossing the Soai Rap River with a length of 2.764 km, a clearance height of 55 m, and a scale of up to 6 lanes. Binh Khanh Bridge is the largest bridge on the entire route, with a total investment of more than 2,800 billion VND.<\/p>\n<p>Binh Khanh Bridge (or J1 package) starts at the intersection of Road 15B and Road No. 2 (Phu Xuan Urban Area, Nha Be). The end point connects to Rung Sac Road at a point about 1.8 km south of Binh Khanh ferry terminal (Binh Khanh commune, Can Gio district).<\/p>\n<p><b><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-8461\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-4-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/b><\/p>\n<p style=\"text-align: justify;\">Along with Binh Khanh Bridge, Phuoc Khanh Bridge is also a bridge in the Ben Luc \u2013 Long Thanh Expressway project, part of the North \u2013 South Expressway in the East. Phuoc Khanh Bridge crosses the Long Tau River, connecting Can Gio District, Ho Chi Minh City with Nhon Trach District, Dong Nai Province.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5.jpg\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-8462\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Binh Khanh Bridge began construction in August 2015 with a total investment of more than VND 2,800 billion, but was temporarily suspended in December 2018 after reaching 70% of the construction progress due to the contractor's announcement of problems with the allocation of construction capital.<\/p>\n<p style=\"text-align: justify;\">At the end of October 2023, Binh Khanh Bridge resumed construction. As of the article's update date in March 2025 (2 years after the re-construction), Binh Khanh Bridge has reached 92% of construction progress.<\/p>\n<h2 style=\"text-align: justify;\">Detailed Information of Binh Khanh Bridge<\/h2>\n<table class=\"huttons_table_post\" style=\"border-collapse: collapse; width: 100%; height: 360px;\">\n<tbody>\n<tr style=\"height: 24px;\">\n<th style=\"width: 50%; height: 24px;\">Detail<\/th>\n<th style=\"width: 50%; height: 24px;\">Description<\/th>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Name<\/td>\n<td style=\"width: 50%; height: 24px;\"><a href=\"https:\/\/vi.wikipedia.org\/wiki\/C%E1%BA%A7u_B%C3%ACnh_Kh%C3%A1nh\" rel=\"nofollow noopener\" target=\"_blank\">Binh Khanh Bridge<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Developer<\/td>\n<td style=\"width: 50%;\">Japan International Cooperation Agency - JICA<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Constructor<\/td>\n<td style=\"width: 50%;\">Sumiitomo \u2013 Cienco4<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Construction start date<\/td>\n<td style=\"width: 50%; height: 24px;\">August 2015<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Expected completion<\/td>\n<td style=\"width: 50%;\">September 2025<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Status<\/td>\n<td style=\"width: 50%;\">Under construction<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Construction status<\/td>\n<td style=\"width: 50%;\">92% (as of March 2025)<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Type<\/td>\n<td style=\"width: 50%; height: 24px;\">Cable-stayed road bridge<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Total length<\/td>\n<td style=\"width: 50%; height: 24px;\">2,763.5 m<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Starting point<\/td>\n<td style=\"width: 50%;\">Intersection of Road 15B and Road No. 2 (Phu Xuan Urban Area, Nha Be)<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;\">Ending point<\/td>\n<td style=\"width: 50%;\">Rung Sac Road, approximately 1.8 km south of Binh Khanh Ferry Terminal (Binh Khanh Commune, Can Gio District)<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Lanes<\/td>\n<td style=\"width: 50%; height: 24px;\">6 lanes (4 lanes for motor vehicles, 2 mixed lanes)<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Main span length<\/td>\n<td style=\"width: 50%; height: 24px;\">375m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Span diagram<\/td>\n<td style=\"width: 50%; height: 24px;\">187.25 + 375 + 187.25 m = 749.5 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Overpass on Nguyen Van Tao street<\/td>\n<td style=\"width: 50%; height: 24px;\">60 + 2 \u00d7 100 + 60 = 320 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">East bridge<\/td>\n<td style=\"width: 50%; height: 24px;\">56 + 11 \u00d7 70 + 56 = 882 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">West bridge<\/td>\n<td style=\"width: 50%; height: 24px;\">56 + 10 \u00d7 70 + 56 = 812 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Bridge cross section<\/td>\n<td style=\"width: 50%; height: 24px;\">21,75 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Bridge pier height<\/td>\n<td style=\"width: 50%; height: 24px;\">155 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Vertical clearance<\/td>\n<td style=\"width: 50%; height: 24px;\">55 m<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 50%; height: 24px;\">Allowed speed<\/td>\n<td style=\"width: 50%; height: 24px;\">60km\/h<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\">In terms of architecture, the bridge is designed as a cable-stayed structure with a single tower, depicting the image of a mangrove tree - a characteristic species of the mangrove forest in Can Gio. The bridge utilizes wave-shaped railings, and the lighting columns create an effect reminiscent of the mangrove forest. Additionally, artistic lighting design is incorporated into the bridge.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6.jpg\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-8463\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-6-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">The Binh Khanh Bridge is an iconic transportation infrastructure contributing to the beauty of the city, harmonizing with the landscape of the Soai Rap River, adjacent structures, and urban planning on both sides of the river.<\/p>\n<h2 style=\"text-align: justify;\">The investor information for the Binh Khanh Bridge project - JICA<\/h2>\n<p style=\"text-align: justify;\"><strong>JICA<\/strong> is stand for <strong>C\u01a1 quan H\u1ee3p t\u00e1c Qu\u1ed1c t\u1ebf Nh\u1eadt B\u1ea3n (<\/strong><b>The Japan International Cooperation Agency)<\/b> - the sole agency implementing Japan's Official Development Assistance (ODA), JICA operates through three forms of cooperation: Technical Cooperation, Financial Cooperation, and Grant Aid. With the goal of contributing to the socio-economic development of developing countries and enhancing Japan's international cooperation, JICA aims to achieve this goal by sharing Japan's knowledge and experience with developing nations.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/jica.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8478\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/jica.jpg\" alt=\"\" width=\"640\" height=\"384\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/jica.jpg 640w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/jica-300x180.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/jica-18x12.jpg 18w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">JICA's priority cooperation areas in Vietnam include promoting growth and enhancing international competitiveness, improving living conditions and narrowing development gaps, and environmental protection.<\/p>\n<p style=\"text-align: justify;\">JICA has supported many key transport projects in Vietnam, notably the urban railway line - Metro Line No. 1 Ben Thanh - Suoi Tien, which has been completed and put into operation in December 2024.<\/p>\n<h2 style=\"text-align: justify;\">The current status and progress of the construction of Binh Khanh Bridge<\/h2>\n<p style=\"text-align: justify;\">After more than two years of restart (since October 2023), the Binh Khanh Bridge continues to be accelerated by the contractor, the project has reached 92% progress. Information from the contractor said that Binh Khanh Bridge will be completed before September 2025.<\/p>\n<h3><strong>Images of the current status and detailed progress of Binh Khanh bridge<\/strong><\/h3>\n<figure id=\"attachment_13623\" aria-describedby=\"caption-attachment-13623\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13623 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-1-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-13623\" class=\"wp-caption-text\">Construction progress of Binh Khanh bridge connecting Nha Be and Can Gio districts updated 2025<\/figcaption><\/figure>\n<p>A representative of the Southern Expressway Management Board (under the Vietnam Expressway Corporation) said, \u201cWorkers are focusing on casting cantilevers and installing stay cables. To date, the project has completed 15\/18 bridge castings.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13624 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p style=\"text-align: justify;\">The section of road leading to Binh Khanh Bridge on the Nha Be side connecting to Long An has been essentially completed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13627 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-5-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p style=\"text-align: justify;\">The section of road leading to Binh Khanh Bridge on the Can Gio side connecting to Phuoc Khanh Bridge towards Nhon Trach (Dong Nai) has also been essentially completed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13629 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-thi-cong-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-7-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p style=\"text-align: justify;\">In addition, package J3 is Phuoc Khanh bridge across Long Tau river connecting Can Gio district (HCMC) and Nhon Trach district (Dong Nai province) with a total length of 3.1km, clearance of 55m.<\/p>\n<h3><strong>More information about Phuoc Khanh bridge<\/strong><\/h3>\n<p style=\"text-align: justify;\">The Phuoc Khanh Bridge bid package was previously implemented by the joint venture Sumitomo Mitsui (Japan) - Cienco 4 (Vietnam). Due to difficulties in policy mechanisms, the Phuoc Khanh Bridge bid package as well as other bid packages of the Ben Luc - Long Thanh Expressway have been stalled for a long time. By 2022, the investor announced the termination of the contract with the contractor of this bid package.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13999 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh.jpg\" alt=\"\" width=\"1360\" height=\"852\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh.jpg 1360w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh-300x188.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh-1024x642.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh-768x481.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2025\/03\/tien-do-cao-toc-ben-luc-long-thanh-18x12.jpg 18w\" sizes=\"(max-width: 1360px) 100vw, 1360px\" \/><\/p>\n<p style=\"text-align: justify;\">On December 3, 2023, the Department of Transport of Ho Chi Minh City said that the Can Gio bridge project, package J3, will be submitted by the Ho Chi Minh City People's Committee to the Ho Chi Minh City People's Council for approval of the investment policy at the 13th session of the 10th City People's Council.<\/p>\n<p style=\"text-align: justify;\">After the obstacles were removed, the investor of Ben Luc - Long Thanh Expressway conducted bidding to select a new contractor to continue the construction of the packages whose contracts had been terminated. According to the Prime Minister's decision approving the adjustment of the project investment policy in July 2023, the deadline for implementation and putting into operation of Ben Luc - Long Thanh Expressway is before September 2026.<\/p>\n<p style=\"text-align: justify;\">Phuoc Khanh Bridge has only completed 82% of its construction volume, making the Ben Luc - Long Thanh expressway unable to operate.<\/p>\n<p style=\"text-align: justify;\">Once completed, Binh Khanh Bridge and Phuoc Khanh Bridge will surpass Phu My Bridge (connecting Thu Duc City and District 7) to become the largest cable-stayed bridges in Ho Chi Minh City.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8476\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-19-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">According to information from the Ministry of Transport, the Ben Luc \u2013 Long Thanh Expressway project has a total length of 57.8 km, passing through the following provinces and cities: Long An (2.7 km), Ho Chi Minh City (26.4 km) and Dong Nai (28.7 km). The project is scheduled to be completed before the third quarter of 2026.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8459\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2.jpg\" alt=\"\" width=\"1500\" height=\"958\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-300x192.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-1024x654.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-768x490.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-2-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">The total updated investment for the project is 29,586.9 billion VND. The project utilizes four sources of funding, including 8,065.7 billion VND from ADB loans, 10,101.3 billion VND from JICA loans, 3,872.4 billion VND from counterpart funds from the state budget, and 7,547.6 billion VND from the investor's self-arranged funds.<\/p>\n<h2 style=\"text-align: justify;\">The master plan for the Can Gio bridge project<\/h2>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8460\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3.jpg\" alt=\"\" width=\"1500\" height=\"844\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3-300x169.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3-1024x576.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3-768x432.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-3-18x10.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<h2>How does Binh Khanh Bridge affect neighboring areas?<\/h2>\n<p>Binh Khanh Bridge and the Ben Luc - Long Thanh expressway in general will play a crucial role in the transportation infrastructure of both Ho Chi Minh City and the southwestern provinces. It not only enhances connectivity between areas but also serves as a significant driver in boosting economic trade between the strongly developing regions.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8469\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-12-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p>Completing the Binh Khanh Bridge to replace the Binh Khanh ferry route directly connects Nha Be district to Can Gio district. This makes travel from Nha Be to Can Gio extremely convenient in terms of both time and load capacity. It creates a seamless transportation route from the southern provinces to Ho Chi Minh City, contributing to the exploitation and promotion of the locality's potential and advantages, facilitating convenient and efficient transportation development.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8470\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-13-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p>Besides promoting tourism in the region, through the Sac Forest route, it is easy to travel to Vung Tau with the Can Gio - Vung Tau ferry. Positively impacting tourism activities, attracting investment and developing the economy - culture - society of Nha Be district, Can Gio district in particular and Ho Chi Minh City in general.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8471\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-14-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p>In particular, the Can Gio bridge project, along with other infrastructure developments in the southern Saigon area such as the Nguyen Van Linh - Nguyen Huu Tho tunnel, the expansion of National Highway 50, Phuoc Long Bridge, Rach Dia Bridge, etc., is expected to breathe new life into the real estate market in this area once completed.<\/p>\n<p>Located in a prime position right on the main thoroughfare Nguyen Huu Tho, the Celesta City urban area with its subdivisions including Celesta Rise, Celesta Heights, Celesta Avenue, etc., developed by Keppel Land, has attracted a significant number of customers and investors' attention recently.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8472\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-15-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p>Evidence for this is in phase 1 of the Celesta City urban area, the Celesta Rise subdivision, which has sold out 100% of its inventory. In phase 2, Celesta Heights also achieved success by selling out on the opening day. In the near future, Keppel Land is planning to launch the last batch of apartments in Celesta Heights.<\/p>\n<p><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8473\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/05\/cap-nhat-thong-tin-cau-binh-khanh-noi-huyen-nha-be-va-can-gio-16-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<p>If you're interested in the Nha Be district area and need advice on choosing real estate here, feel free to contact us. Huttons VN is the official distributor of the Celesta Heights project in Nha Be. You can find detailed information about the Celesta Heights project here.<\/p>\n<blockquote class=\"ht_blockquote\"><p>INFORMATION ABOUT CELESTA CITY URBAN AREA:<\/p>\n<ul>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/celesta-heights\/\">Celesta Heights<\/a><\/li>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/celesta-rise\/\">Celesta Rise<\/a><\/li>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/celesta-avenue\/\">Celesta Avenue<\/a><\/li>\n<\/ul>\n<\/blockquote>\n<p>&nbsp;<\/p>\n<p style=\"text-align: right;\"><em><strong>Source: Internet<\/strong><\/em><\/p>\n<blockquote class=\"ht_blockquote\"><p>SEE MORE:<\/p>\n<ul>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/tien-do-cau-nhon-trach-noi-dong-nai-va-tp-hcm-11538\/\">Update on the progress of Nhon Trach bridge connecting Dong Nai and Ho Chi Minh City<\/a><\/li>\n<\/ul>\n<\/blockquote>","protected":false},"excerpt":{"rendered":"<p>C\u1ea7u B\u00ecnh Kh\u00e1nh n\u1eb1m trong tuy\u1ebfn cao t\u1ed1c B\u1ebfn L\u1ee9c &#8211; Long Th\u00e0nh, l\u00e0 c\u1ea7u d\u00e2y v\u0103ng \u0111\u01b0\u1eddng b\u1ed9 v\u01b0\u1ee3t s\u00f4ng So\u00e0i R\u1ea1p v\u1edbi chi\u1ec1u d\u00e0i c\u1ea7u 2,764 km, t\u0129nh kh\u00f4ng th\u00f4ng thuy\u1ec1n cao 55 m quy m\u00f4 l\u00ean \u0111\u1ebfn 6 l\u00e0n xe. C\u1ea7u B\u00ecnh Kh\u00e1nh l\u00e0 c\u00e2y c\u1ea7u l\u1edbn nh\u1ea5t tr\u00ean to\u00e0n tuy\u1ebfn, v\u1edbi [&hellip;]<\/p>","protected":false},"author":1,"featured_media":8482,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[91],"tags":[],"class_list":["post-8415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/8415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/comments?post=8415"}],"version-history":[{"count":21,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/8415\/revisions"}],"predecessor-version":[{"id":14001,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/8415\/revisions\/14001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media\/8482"}],"wp:attachment":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media?parent=8415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/categories?post=8415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/tags?post=8415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}