{"id":6937,"date":"2025-03-10T00:00:07","date_gmt":"2025-03-09T17:00:07","guid":{"rendered":"http:\/\/huttons.com.vn\/?p=6937"},"modified":"2025-03-10T14:52:23","modified_gmt":"2025-03-10T07:52:23","slug":"eaton-park-construction-update","status":"publish","type":"post","link":"https:\/\/huttons.com.vn\/en\/eaton-park-construction-update-6937","title":{"rendered":"Eaton Park project construction progress update March 2025"},"content":{"rendered":"<p style=\"text-align: justify;\"><em><strong>Construction progress of Eaton Park project 2025 \u2013 Since the groundbreaking date, Gamuda Land Group and main contractor Fountech are continuing to implement the construction of Eaton Park project at the front of Mai Chi Tho street, An Phu ward, Thu Duc city, Ho Chi Minh city. <\/strong><\/em><\/p>\n<p style=\"text-align: justify;\"><em><strong>Let's together with Huttons VN to quickly update the construction progress of the Eaton Park project through the article below.<\/strong><\/em><\/p>\n<h2 style=\"text-align: justify;\">Fountech \u2013 Main construction contractor of Eaton Park<\/h2>\n<p style=\"text-align: justify;\">At the groundbreaking ceremony, Mr. Vu Cong Van - General Director of Fountech also affirmed that Eaton Park is one of the large-scale projects. Therefore, to carry out construction, both the developer and the main contractor have put a lot of enthusiasm into this project.<\/p>\n<figure id=\"attachment_7064\" aria-describedby=\"caption-attachment-7064\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-7064\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/le-dong-tho-du-an-eaton-park-gamuda-land-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><figcaption id=\"caption-attachment-7064\" class=\"wp-caption-text\">Groundbreaking ceremony of Eaton Park - Gamuda Land - Fountech<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><strong>\u201cDuring the project construction process, we always put construction safety criteria first. At the same time, the construction unit ensures construction progress as well as project quality\",\n\u200b<\/strong> Mr. Van pledged.<\/p>\n<h3 style=\"text-align: justify;\">About Fountech contractor<\/h3>\n<p style=\"text-align: justify;\">Established in 2007 in Hanoi, core competencies are the construction of bored piles, diaphragm walls, barette piles, and seaport bridge construction. Up to now, Fountech has continuously continued to develop with activities of investing in the most advanced equipment and technology in the field of foundation treatment, enhancing training, learning from experience, and promptly grasping new information. to serve domestic and regional construction needs.<\/p>\n<ul style=\"text-align: justify;\">\n<li>Full name: C\u00d4NG TY C\u1ed4 PH\u1ea6N FOUNTECH<\/li>\n<li>International name: FOUNTECH JOINT STOCK COMPANY<\/li>\n<li>Tax code: 0102291083<\/li>\n<li>Head office: 5th floor, 29T1 Hoang Dao Thuy building, Trung Hoa Ward, Cau Giay District, Hanoi<\/li>\n<li>Legal representative: Vu Cong Van<\/li>\n<li>Website: www.fountech.vn<\/li>\n<li>Operating motto: \"Quality, progress, safety, efficiency and environmental protection\"<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Fountech has extensive cooperative relationships with many domestic and international units. As the main construction contractor of the Eaton Park project, the company affirms that it fully meets all requirements during project implementation.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai.jpg\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-7062\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/cac-du-an-fountech-da-trien-khai-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><\/p>\n<h3 style=\"text-align: justify;\">Fountech portfolio<\/h3>\n<p style=\"text-align: justify;\">With more than 17 years of experience in formation and development, Fountech has proven its reputation with a huge list of projects that have participated in cooperation and implementation, typical names such as Samsung R&amp;D Center can be mentioned. , Vinhomes Grand Park, Vinhomes Ocean Park, Vinhomes Sky Lake, Vinhomes WestPoint, Diamond Crown Plaza Hai Phong, Sun Marina Tower, Ba Na Hills Da Nang, Hoa Phat Steel Factory, Van Don Casino, Sea Star Hotel Ha Long,\u2026<\/p>\n<h2 style=\"text-align: justify;\">Eaton Park \u2013 Gamuda Land<\/h2>\n<p style=\"text-align: justify;\">Also at the groundbreaking ceremony, Mr. Teoh Chin Siang - Director of the Eaton Park project expressed confidence that the Eaton Park project will achieve great success in the near future. With a prime location and high quality amenities in the luxury apartment segment in the East and Ho Chi Minh City in general.\n\u200b<\/p>\n<figure id=\"attachment_6665\" aria-describedby=\"caption-attachment-6665\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn.jpg\"><img decoding=\"async\" class=\"size-full wp-image-6665\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/12\/vi-tri-du-an-eaton-park-gamuda-huttonsvn-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/a><figcaption id=\"caption-attachment-6665\" class=\"wp-caption-text\">Eaton Park \u2013 Gamuda Land<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Eaton Park is developed by Gamuda Land Group. The project is being built on a land area of 3.68 hectares, including 6 towers of 37-39 floors, providing nearly 2,000 apartments. The area of the apartments ranges from 46-196m2 with a variety of types: 1-3 bedrooms, duplex, duel key and penthouse.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land.png\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6885\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land.png\" alt=\"\" width=\"1600\" height=\"1200\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land.png 1600w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land-300x225.png 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land-1024x768.png 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land-768x576.png 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land-1536x1152.png 1536w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/01\/sa-ban-du-an-eaton-park-gamuda-land-16x12.png 16w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">The project is divided into 2 subdivisions, subdivision 1 includes 4 towers with 15 shophouses and 1,308 apartments. Division 2 includes 2 towers with 5 shophouses and 672 apartments. It is expected that the apartments will be offered for sale at prices ranging from 4,000-7,000 USD\/m2, equivalent to 97-170 million VND\/m2. Eaton Park will be launched in the first quarter of 2024.<\/p>\n<h2 style=\"text-align: justify;\">Ti\u1ebfn \u0111\u1ed9 x\u00e2y d\u1ef1ng d\u1ef1 \u00e1n Eaton Park &#8211; Gamuda Land th\u00e1ng 03\/2025<\/h2>\n<p>Gamuda Land, in collaboration with the contractor Fountech, is striving to push forward the Eaton Park project according to the planned schedule. The project's construction progress is divided into the following specific phases:<\/p>\n<ul>\n<li><strong>Phase 1:<\/strong> Bao g\u1ed3m hai t\u00f2a Grove (A5), Strait (A6) v\u00e0 khu nh\u00e0 m\u1eabu. Hi\u1ec7n t\u1ea1i, c\u00e1c t\u1ea7ng h\u1ea7m \u0111\u00e3 \u0111\u01b0\u1ee3c ho\u00e0n t\u1ea5t v\u00e0 ph\u1ea7n th\u00e2n c\u1ee7a c\u00e1c t\u00f2a th\u00e1p \u0111ang \u0111\u01b0\u1ee3c tri\u1ec3n khai x\u00e2y d\u1ef1ng. Khu nh\u00e0 m\u1eabu \u0111\u00e3 ho\u00e0n thi\u1ec7n v\u00e0 c\u00f3 th\u1ec3 \u0111\u00f3n kh\u00e1ch tham quan.<\/li>\n<li><strong>Phase 2:<\/strong> G\u1ed3m hai t\u00f2a Alpine (A1), Forest (A2), \u0111ang tri\u1ec3n khai c\u00e1c h\u1ea1n m\u1ee5c thi c\u00f4ng.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">With a complete set of legal documents, the construction process of the Eaton Park project is being accelerated by contractor Fountech. Let's take a look at some pictures at the project site:\n\u200b<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-1-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-2.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-3.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-4.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-5.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\"><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-13646 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2024\/10\/tien-do-xay-dung-du-an-eaton-park-6.jpg\" alt=\"\" width=\"1500\" height=\"1000\" title=\"\"><\/p>\n<p>The contractor team is focusing on executing the tasks according to the schedule, aiming to deliver the premium apartments by 2027. Gamuda Land is committed not only to the timeline but also to the quality of the project, thanks to the collaboration of a reputable and experienced construction team, strong financial resources, and an efficient land clearance process.<\/p>\n<p>All legal procedures and related documents have been completed, establishing a transparent and secure project for customers to choose as their residence or investment opportunity.<\/p>\n<p style=\"text-align: right;\"><em><strong>Source: Internet<\/strong><\/em><\/p>\n<blockquote class=\"ht_blockquote\"><p>LATEST PROJECT UPDATE FOR EATON PARK MAI CHI THO BOULEVARD:<\/p>\n<ul>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/eaton-park\/\">Eaton Park Project Fact Sheet<\/a><\/li>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/giai-dap-thac-mac-ve-du-an-eaton-park-7808\/\">Frequently Asked Questions about the Eaton Park Project<\/a><\/li>\n<li><a href=\"https:\/\/huttons.com.vn\/en\/thong-tin-phap-ly-eaton-park-gamuda-land-7206\/\">View the Complete Set of Legal Documents for the Eaton Park Project<\/a><\/li>\n<\/ul>\n<\/blockquote>","protected":false},"excerpt":{"rendered":"<p>Ti\u1ebfn \u0111\u1ed9 thi c\u00f4ng d\u1ef1 \u00e1n Eaton Park 2025 &#8211; K\u1ec3 t\u1eeb ng\u00e0y kh\u1edfi c\u00f4ng, T\u1eadp \u0111o\u00e0n Gamuda Land v\u00e0 nh\u00e0 th\u1ea7u ch\u00ednh Fountech \u0111ang ti\u1ebfp t\u1ee5c tri\u1ec3n khai x\u00e2y d\u1ef1ng d\u1ef1 \u00e1n Eaton Park t\u1ea1i m\u1eb7t ti\u1ec1n \u0111\u01b0\u1eddng Mai Ch\u00ed Th\u1ecd, ph\u01b0\u1eddng An Ph\u00fa, TP Th\u1ee7 \u0110\u1ee9c, TP.HCM. H\u00e3y c\u00f9ng Huttons VN c\u1eadp nh\u1eadt [&hellip;]<\/p>","protected":false},"author":1,"featured_media":7070,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[158],"class_list":["post-6937","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-update","tag-eaton-park"],"acf":[],"_links":{"self":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/6937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6937"}],"version-history":[{"count":4,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/6937\/revisions"}],"predecessor-version":[{"id":13654,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/6937\/revisions\/13654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media\/7070"}],"wp:attachment":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}