{"id":6282,"date":"2023-11-13T15:40:10","date_gmt":"2023-11-13T08:40:10","guid":{"rendered":"http:\/\/huttons.com.vn\/?p=6282"},"modified":"2023-11-13T15:51:55","modified_gmt":"2023-11-13T08:51:55","slug":"dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-thanh-pho","status":"publish","type":"post","link":"https:\/\/huttons.com.vn\/en\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-thanh-pho-6282","title":{"rendered":"New bridge planned between southern HCMC and downtown"},"content":{"rendered":"<p style=\"text-align: justify;\">The Nguyen Khoai bridge and road project, spanning nearly 5 km, connects districts 7, 4, and 1, with an investment capital of over 3,700 billion VND, facilitating additional connectivity from the South to the center of Ho Chi Minh City.<\/p>\n<figure id=\"attachment_6283\" aria-describedby=\"caption-attachment-6283\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-6283 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1.jpg\" alt=\"Ph\u1ed1i c\u1ea3nh h\u01b0\u1edbng tuy\u1ebfn d\u1ef1 \u00e1n c\u1ea7u - \u0111\u01b0\u1eddng Nguy\u1ec5n Kho\u00e1i v\u00e0 hi\u1ec7n tr\u1ea1ng c\u00e1c \u0111\u01b0\u1eddng n\u1ed1i \u0111\u1ebfn k\u00eanh T\u1ebb, gi\u1eefa m\u1ed9t b\u00ean l\u00e0 qu\u1eadn 4 v\u00e0 m\u1ed9t b\u00ean thu\u1ed9c qu\u1eadn 7.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-1-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6283\" class=\"wp-caption-text\">Visual representation of the proposed Nguyen Khoai bridge and road project, along with the current status of connecting roads to the Te Canal, situated between District 4 on one side and District 7 on the other.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">The project, recently reported by the Ho Chi Minh City Department of Transport, is set to be submitted to the City People's Council for approval of the investment proposal. Initially approved in 2017 with a total capital of 1,250 billion VND, the project's construction scale change has led to the current increased budget of 3,725 billion VND.<\/p>\n<p style=\"text-align: justify;\">According to the feasibility study, the project starts from D1 road (Him Lam residential area, District 7), then crosses the Te Canal through District 4 and continues elevated along Nguyen Khoai Street, crossing Ben Nghe Canal to connect to Vo Van Kiet Boulevard, District 1.<\/p>\n<figure id=\"attachment_6289\" aria-describedby=\"caption-attachment-6289\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-6289 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2.jpg\" alt=\"The project has a total length of nearly 5 km. This includes a bridge section approximately 2.5 km long, with a width ranging from 6.5 to 25.5 meters, and a road section extending over 2.3 km, with a width ranging from 26.5 to 61.5 meters.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-2-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6289\" class=\"wp-caption-text\">The project has a total length of nearly 5 km. This includes a bridge section approximately 2.5 km long, with a width ranging from 6.5 to 25.5 meters, and a road section extending over 2.3 km, with a width ranging from 26.5 to 61.5 meters.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">On the final stretch connecting to District 1, the main bridge section crosses the Ben Nghe Canal and then branches into two, designated as N7 and N8, forming a loop that descends to Vo Van Kiet Street.<\/p>\n<p style=\"text-align: justify;\">The two branches N5 and N6 also help vehicles from Nguyen Khoai bridge get to and from other lanes of Vo Van Kiet Avenue.<\/p>\n<figure id=\"attachment_6290\" aria-describedby=\"caption-attachment-6290\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-6290 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3.jpg\" alt=\"Renderings of the bridge crossing the Te Canal and the current situation.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-3-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6290\" class=\"wp-caption-text\">Renderings of the bridge crossing the Te Canal and the current situation.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">In the section passing through District 4, branches N3 and N4 are constructed to connect to Ton That Thuyet Street, enabling two-way traffic to link with the main bridge section, facilitating convenient movement between District 1 and District 7.<\/p>\n<p style=\"text-align: justify;\">On the other side of Te canal in District 7, two branches N1 and N2 were also built for vehicles to go up and down from Nguyen Khoai bridge to Tran Xuan Soan street.\n\u200b<\/p>\n<p style=\"text-align: justify;\">At each branch there are stairs connecting the routes below.<\/p>\n<figure id=\"attachment_6291\" aria-describedby=\"caption-attachment-6291\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6291 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4.jpg\" alt=\"Perspective of green area and lighting on Nguyen Khoai street after the viaduct was built.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-4-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6291\" class=\"wp-caption-text\">Perspective of green area and lighting on Nguyen Khoai street after the viaduct was built.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Nguyen Khoai Street is currently one of the main traffic arteries in District 4, often congested, especially during rush hours.<\/p>\n<figure id=\"attachment_6284\" aria-describedby=\"caption-attachment-6284\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6284 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5.jpg\" alt=\"Ph\u1ed1i c\u1ea3nh \u0111\u01b0\u1eddng V\u00f5 V\u0103n Ki\u1ec7t, qu\u1eadn 1, thu\u1ed9c \u0111o\u1ea1n cu\u1ed1i d\u1ef1 \u00e1n c\u1ea7u - \u0111\u01b0\u1eddng Nguy\u1ec5n Kho\u00e1i.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-5-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6284\" class=\"wp-caption-text\">Perspective of Vo Van Kiet Street, District 1, at the end of the bridge project - Nguyen Khoai Street.\n\u200b<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Within the scope of the project, Vo Van Kiet street will be expanded towards Ben Nghe canal to organize synchronous traffic when the project is formed. In District 4, the existing Nguyen Khoai street was upgraded because it was later located under the viaduct.<\/p>\n<figure id=\"attachment_6285\" aria-describedby=\"caption-attachment-6285\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6285 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6.jpg\" alt=\"Current status of both banks of Te Canal: on the right is District 4, on the left is District 7, in front is Kenh Te Bridge.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-6-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6285\" class=\"wp-caption-text\">Current status of both banks of Te Canal: on the right is District 4, on the left is District 7, in front is Kenh Te Bridge.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">When the project is formed, from South Saigon through the city center there will be a new connection direction, reducing traffic pressure on existing routes.<\/p>\n<figure id=\"attachment_6286\" aria-describedby=\"caption-attachment-6286\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6286 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7.jpg\" alt=\"D\u00f2ng xe n\u1ed1i \u0111u\u00f4i nhau qua c\u1ea7u K\u00eanh T\u1ebb - tr\u1ee5c giao th\u00f4ng ch\u00ednh k\u1ebft n\u1ed1i huy\u1ec7n Nh\u00e0 B\u00e8, qu\u1eadn 7 qua trung t\u00e2m TP HCM.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-7-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6286\" class=\"wp-caption-text\">Vehicles line up across Kenh Te Bridge - the main traffic axis connecting Nha Be district, District 7 through the center of Ho Chi Minh City.<\/figcaption><\/figure>\n<figure id=\"attachment_6287\" aria-describedby=\"caption-attachment-6287\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6287 size-full\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8.jpg\" alt=\"In the other direction, Nguyen Tat Thanh street linking the South through the city center is also seriously overloaded and often congested.\" width=\"1500\" height=\"1000\" title=\"\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-8-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6287\" class=\"wp-caption-text\">In the other direction, Nguyen Tat Thanh street linking the South through the city center is also seriously overloaded and often congested.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">When built, Nguyen Khoai bridge and street, in addition to \"sharing fire\" with the above routes, also helps traffic from Binh Chanh district and district 8 follow Duong Ba Trac street and Nguyen Van Cu bridge to district 1 to reduce congestion.<\/p>\n<figure id=\"attachment_6288\" aria-describedby=\"caption-attachment-6288\" style=\"width: 1500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6288 size-full\" title=\"Existing roads from the South to the city center are overloaded and large projects are being and are about to be implemented. Graphics: Thanh Huyen.\" src=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9.jpg\" alt=\"Existing roads from the South to the city center are overloaded and large projects are being and are about to be implemented. Graphics: Thanh Huyen.\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9.jpg 1500w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9-300x200.jpg 300w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9-1024x683.jpg 1024w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9-768x512.jpg 768w, https:\/\/huttons.com.vn\/wp-content\/uploads\/2023\/11\/dien-mao-cau-noi-nam-sai-gon-voi-trung-tam-trong-tuong-lai-9-18x12.jpg 18w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><figcaption id=\"caption-attachment-6288\" class=\"wp-caption-text\">Existing roads from the South to the city center are overloaded and large projects are being and are about to be implemented. Graphics: Thanh Huyen.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">According to the plan, the Nguyen Khoai project, after being approved for adjustments, will start construction in the fourth quarter of 2024, and be fully completed 3 years later.<\/p>\n<p style=\"text-align: justify;\">In addition, Ho Chi Minh City is building an underpass at the intersection of Nguyen Van Linh - Nguyen Huu Tho, District 7, to help reduce congestion at the key intersection of the southern gateway. At the same time, to increase traffic connection for the above area, Thu Thiem 4 Bridge (connecting District 7 with Thu Thiem New Urban Area) is being planned by the city to invest with a total capital of 5,000 billion VND.<\/p>\n<p style=\"text-align: right;\"><em><strong>Source: VnExpress<\/strong><\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>D\u1ef1 \u00e1n c\u1ea7u &#8211; \u0111\u01b0\u1eddng Nguy\u1ec5n Kho\u00e1i d\u00e0i g\u1ea7n 5 km, k\u1ebft n\u1ed1i qu\u1eadn 7, 4, 1, v\u1ed1n \u0111\u1ea7u t\u01b0 h\u01a1n 3.700 t\u1ef7 \u0111\u1ed3ng, gi\u00fap m\u1edf th\u00eam h\u01b0\u1edbng k\u1ebft n\u1ed1i khu Nam v\u1edbi trung t\u00e2m TP HCM. C\u00f4ng tr\u00ecnh v\u1eeba \u0111\u01b0\u1ee3c S\u1edf Giao th\u00f4ng V\u1eadn t\u1ea3i TP HCM b\u00e1o c\u00e1o, s\u1eafp t\u1edbi s\u1ebd tr\u00ecnh H\u0110ND [&hellip;]<\/p>","protected":false},"author":1,"featured_media":6297,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[91],"tags":[],"class_list":["post-6282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/6282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6282"}],"version-history":[{"count":0,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/posts\/6282\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media\/6297"}],"wp:attachment":[{"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/huttons.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}